INFRASTRUCTURE:
|
WALLS, FLOORS, CEILINGS AND MISCELLANEOUS INSTALLATIONS
| They must be completed so that the installation of the equipment can proceed normally.
|
DISTANCE
| The work areas required must be respected.
|
LIFTS:
|
FLOOR
| Cement with compressive strength of 30 Mpa. Minimum thickness: 15 cm. Leveling no more than 1%.
|
CEILINGS
| Minimum height 4.15 m.
|
ELECTRICITY
| Panel with 32 A THREE-PHASE with grounding, close to the installation site.
|
PNEUMATIC
| Air compressor with hose and gun at the equipment installation site.
|
ALIGNERS
|
ELECTRICITY
| Panel with SINGLE PHASE 10 A grounded outlet, close to the installation location.
|
WHEELS BALANCERS
|
ELECTRICITY CAR / PICK UP
| Panel with THREE-PHASE 16 A grounded outlet, close to the installation location.
|
ELECTRICITY TRUCK
| Panel with SINGLE PHASE 10 A grounded outlet, close to the installation location.
|
WHEELS BALANCERS
|
ELECTRICITY
| Panel with THREE-PHASE 32 A grounded outlet, close to the installation location.
|
For the correct unloading of the equipment, and so that it does not suffer any damage, the client will provide for the availability of 2 people to assist the PESSOT staff and the provision of a forklift.
|